Indian Town Rd Improvements
The project improvements consist of milling and resurfacing the existing roadway, re-aligning the SR 9/I-95 northbound to SR 706/Indiantown Road eastbound off-ramp to a new signalized intersection, lengthening the eastbound SR 706/Indiantown Road left turn lane to northbound SR 9/I-95, widening eastbound SR 706/Indiantown Road to provide an additional through lane and a buffered bike lane in various locations from the Florida Turnpike entrance to Central Boulevard, widening westbound SR 706/Indiantown Road to provide an additional through lane and a bike lane from 67th Road North to SR 9/I-95, widening the Indiantown Road Bridge over the C-18 canal in both directions to provide an additional through lane, upgrading Wrong-Way Driving Countermeasures on the SR 9/I-95 northbound and southbound exit ramps, upgrading Digital Message Sign (DMS) structures on westbound SR 706/Indiantown Road between Island Way and 67th Road N, widening the I-95 northbound and southbound on-ramp acceleration lane, installing sidewalk along eastbound SR 706/Indiantown Road from the Florida Turnpike entrance to Island Way, upgrading curb ramps to meet Americans with Disability Act (ADA) standards, installing patterned pavement crosswalks at Central Boulevard, upgrading drainage, signage, lighting, signalization and pavement markings and upgrading Intelligent Transportation System (ITS) throughout the project corridor.
- GROUPING: I-95 Grouping
- CLIENT: Palmbeach Operations District 4
- PROJECT LIMITS: State road 706 (Indian Town Rd) at State Rd 9 (I-95) 1.44 miles in the town of Jupiter
- ROLE: CEI Prime Consultant
- PROJECT LENGTH: 570 days
- ANTICIPATED COMPLETION: Summer 2025
- ANTICIPATED COST: $ 17.98 million
- CONTRACT TYPE: Design Bid Build