


BIG JOHN MONAHAN
2014 DBIF – BEST DESIGN-BUILD PROJECT – MONAHAN BRIDGE


- CLIENT: District IV Treasure Coast Operations
- PROJECT LIMITS: From SW Trail Dr. to east of the SR-76 connector ramps
- Role: CEI Prime Consultant
- PROJECT LENGTH: 1.743 Miles
- COMPLETED: June 2014
- COST: $31.9 million
- CONTRACT TYPE: Design Build