I-95 Phase 3B2
I-95 Express Lanes Phase 3B-2 will extend the Express Lanes north from just south of Glades Road to south of Linton Boulevard in Palm Beach County. One lane will be added, and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction; the number of General Use lanes will remain the same. Access to the Express Lanes will be provided via two designated ingress and egress locations—between Glades Road and Spanish River Boulevard and between Yamato Road and Linton Boulevard.
The scope of work includes reconfiguration of the SR 808/Glades Road Interchange to a Diverging Diamond Interchange (DDI). Additional project improvements include overhead sign structure installation, Intelligent Transportation System (ITS) express lane markers, new signalization, lighting, utility relocation and ramp signaling at five interchanges from Glades Road to Linton Boulevard. Shoulder-mounted sound barrier walls will be constructed along I-95 northbound between Clint Moore Road and Linton Boulevard. Ground-mounted sound walls will be installed on Yamato Road adjacent to the University Heights community and along I-95 northbound south of Linton Boulevard adjacent to the Tierra Verde community. The Clint Moore Road bridge over I-95 will be reconstructed to improve clearance over I-95 travel lanes. Bridge widening will be performed at the Glades Road bridge over the South Florida Regional Transportation Authority (SFRTA) railroad tracks and Military Trail and the I-95 bridge over the C-15 Canal between Peninsula Drive and Linton Boulevard.
- CLIENT: District IV Palm Beach Operations
- PROJECT LIMITS: I-95 South of Glades Rd. to South of Linton Blvd.
- ROLE: CEI Subconsultant
- PROJECT LENGTH: 6.5 Miles
- ANTICIPATED COMPLETION: Fall 2023
- ANTICIPATED COST: $148 Million
- CONTRACT TYPE: Design Build