• Home
  • Completed Projects
  • Ongoing Projects
  • News & Insights
  • Meet The Team
  • Careers

Over 15 Years Delivering Quality and Excellence

info@cegroupfl.com
EMPLOYEE PORTAL
Creative Engineering GroupCreative Engineering Group
  • Home
  • Completed Projects
  • Ongoing Projects
  • News & Insights
  • Meet The Team
  • Careers

Clintmoore Rd. Bridge - Nov2019 Clintmoore Rd. Bridge - Sept2021 Spanish River Blvd. Bridge - Nov2019 Spanish River Blvd. Bridge - Sept2021 Glades Rd. Interchange - Nov2019 Linton Blvd. Interchange - Nov2019 I-95 Phase 3B2

I-95 Phase 3B2

I-95 Express Lanes Phase 3B-2 will extend the Express Lanes north from just south of Glades Road to south of Linton Boulevard in Palm Beach County. One lane will be added, and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction; the number of General Use lanes will remain the same. Access to the Express Lanes will be provided via two designated ingress and egress locations—between Glades Road and Spanish River Boulevard and between Yamato Road and Linton Boulevard.

The scope of work includes reconfiguration of the SR 808/Glades Road Interchange to a Diverging Diamond Interchange (DDI). Additional project improvements include overhead sign structure installation, Intelligent Transportation System (ITS) express lane markers, new signalization, lighting, utility relocation and ramp signaling at five interchanges from Glades Road to Linton Boulevard. Shoulder-mounted sound barrier walls will be constructed along I-95 northbound between Clint Moore Road and Linton Boulevard. Ground-mounted sound walls will be installed on Yamato Road adjacent to the University Heights community and along I-95 northbound south of Linton Boulevard adjacent to the Tierra Verde community. The Clint Moore Road bridge over I-95 will be reconstructed to improve clearance over I-95 travel lanes. Bridge widening will be performed at the Glades Road bridge over the South Florida Regional Transportation Authority (SFRTA) railroad tracks and Military Trail and the I-95 bridge over the C-15 Canal between Peninsula Drive and Linton Boulevard.

Clintmoore Rd. Bridge demolition
  • CLIENT: District IV Palm Beach Operations
  • PROJECT LIMITS: I-95 South of Glades Rd. to South of Linton Blvd.
  • ROLE: CEI Subconsultant
  • PROJECT LENGTH: 6.5 Miles
  • ANTICIPATED COMPLETION: Fall 2023
  • ANTICIPATED COST: $148 Million
  • CONTRACT TYPE: Design Build

Explore More Projects

US-27 Resurfacing in Palm Beach County

SR710 BIG JOHN MONAHAN BRIDGE REPLACEMENT PROJECT

US-27 Resurfacing in Broward County

Martin County Resurfacing on Turnpike

Experienced and Qualified Engineering Inspection Staff! Meet Our Team

Contact Info

  • Creative Engineering Group Inc
  • 7735 NW 146th St #301 Miami Lakes, Fl 33016
  • 786-362-6626
  • info@cegroupfl.com

Logo Committed to Quality and Dependability.

Our Family

CREATIVE IS HIRING

Creative values energetic, task oriented, forward thinking individuals to fill their TEAM. To join our family, click the link below.

OPEN POSITIONS

EMPLOYEE BENEFITS

EMPLOYEE PORTAL

© 2025 — Creative Engineering Group Inc.

  • Home
  • About
  • Our Team
  • Open Positions