• Home
  • Completed Projects
  • Ongoing Projects
  • News & Insights
  • Meet The Team
  • Careers

Over 15 Years Delivering Quality and Excellence

info@cegroupfl.com
EMPLOYEE PORTAL
Creative Engineering GroupCreative Engineering Group
  • Home
  • Completed Projects
  • Ongoing Projects
  • News & Insights
  • Meet The Team
  • Careers

Linton Blvd. Interchange - Nov2019 Clintmoore Rd. Bridge - Nov2019 Indian Town Rd Improvements

Indian Town Rd Improvements

The project improvements consist of milling and resurfacing the existing roadway, re-aligning the SR 9/I-95 northbound to SR 706/Indiantown Road eastbound off-ramp to a new signalized intersection, lengthening the eastbound SR 706/Indiantown Road left turn lane to northbound SR 9/I-95, widening eastbound SR 706/Indiantown Road to provide an additional through lane and a buffered bike lane in various locations from the Florida Turnpike entrance to Central Boulevard, widening westbound SR 706/Indiantown Road to provide an additional through lane and a bike lane from 67th Road North to SR 9/I-95, widening the Indiantown Road Bridge over the C-18 canal in both directions to provide an additional through lane, upgrading Wrong-Way Driving Countermeasures on the SR 9/I-95 northbound and southbound exit ramps, upgrading Digital Message Sign (DMS) structures on westbound SR 706/Indiantown Road between Island Way and 67th Road N, widening the I-95 northbound and southbound on-ramp acceleration lane, installing sidewalk along eastbound SR 706/Indiantown Road from the Florida Turnpike entrance to Island Way, upgrading curb ramps to meet Americans with Disability Act (ADA) standards, installing patterned pavement crosswalks at Central Boulevard, upgrading drainage, signage, lighting, signalization and pavement markings and upgrading Intelligent Transportation System (ITS) throughout the project corridor.

  • GROUPING: I-95 Grouping
  • CLIENT: Palmbeach Operations District 4
  • PROJECT LIMITS: State road 706 (Indian Town Rd) at State Rd 9 (I-95) 1.44 miles in the town of Jupiter
  • ROLE: CEI Prime Consultant
  • PROJECT LENGTH: 570 days
  • ANTICIPATED COMPLETION: Summer 2025
  • ANTICIPATED COST: $ 17.98 million
  • CONTRACT TYPE: Design Bid Build

Explore More Projects

JTB and San Pablo Road Diverging Diamond Interchange

KANNER HIGHWAY

KINGS HIGHWAY AND INDRIO ROAD INTERSECTION IMPROVEMENT

Homestead Extension of Florida’s Turnpike Widening Project

Experienced and Qualified Engineering Inspection Staff! Meet Our Team

Contact Info

  • Creative Engineering Group Inc
  • 7735 NW 146th St #301 Miami Lakes, Fl 33016
  • 786-362-6626
  • info@cegroupfl.com

Logo Committed to Quality and Dependability.

Our Family

CREATIVE IS HIRING

Creative values energetic, task oriented, forward thinking individuals to fill their TEAM. To join our family, click the link below.

OPEN POSITIONS

EMPLOYEE BENEFITS

EMPLOYEE PORTAL

© 2025 — Creative Engineering Group Inc.

  • Home
  • About
  • Our Team
  • Open Positions