Kings Highway was expanded to a four-lane divided highway with designated buffered bicycle lanes and pedestrian facilities. Indrio Road was improved immediately West and East of the intersection with dual thru lanes to accept the traffic turning movements off of Kings Highway. The intersections of Indrio Road at the Lakewood Park Elementary school were upgraded to include designated left and tight turning movements. To improve safety for pedestrians, the project included the construction of a 12-foot wide shared use path along the west of Kings Highway from the intersection south and along Indrio Road from the intersection west past the Lakewood Park Elementary School to Seminole road. To facilitate the widening, construction of a 9′ x 6′ box culvert and canal realignment were necessary.
Improvements to Kings Highway at the Intersection of Indrio Road
There is nothing to show here!
Slider with alias KingsHwySlider not found.
- CLIENT: District IV Treasure Coast Operations
- PROJECT LIMITS: Kings Highway and Indrio Road Intersection
- ROLE: CEI Subconsultant
- PROJECT LENGTH: 1.8 Miles
- COMPLETED: Spring 2019
- COST: $17.8 million
- CONTRACT TYPE: Design Bid Build