• Home
  • Completed Projects
  • Ongoing Projects
  • News & Insights
  • Meet The Team
  • Careers

Over 15 Years Delivering Quality and Excellence

info@cegroupfl.com
EMPLOYEE PORTAL
Creative Engineering GroupCreative Engineering Group
  • Home
  • Completed Projects
  • Ongoing Projects
  • News & Insights
  • Meet The Team
  • Careers

Hypoluxo Rd. Palm Beach Service Plaza Lantana Rd. Stanley Weaver Canal Slide Palm Beach Widening on Turnpike

Palm Beach Widening on Turnpike

This project consists of SR 91 Turnpike Mainline Widening from four and six lanes to six and eight lanes from north of SR 804 (Boynton Beach Boulevard) (milepost 87.1) to north of SR 802 (Lake Worth Road) (milepost 94.7). The typical section consists of one future express lane and three general tolled lanes in each direction. This project will realign the Turnpikes centerline to the west to prevent the proposed improvements from encroaching into the Florida Gas Transmission (FGT) facility specified width.

Additional features include the construction of a bulkhead wall along a section of the LWDD E-2W Canal bank, realignment of a section of the LWDD’s E-2E Canal, modifications to the Lake Worth Rd. interchange ramps, construction of a mainline All Electronic Toll (AET) gantry south of the existing Lantana Toll Plaza designed for the ultimate condition and partial removal/reconstruction of the middle portion of the existing Lantana Toll Plaza to accommodate six through lanes, with the remainder of ticket lanes (four in each direction) to remain in operation.

The project also includes bridge construction, bridge demolition, bridge widening, pile driving, major drainage, excavation/embankment, channel excavation, retaining wall systems, noise walls, fencing, guardrail, stabilization, optional base groups, structural asphalt, friction course, milling and resurfacing, signing and pavement markings including thermoplastic, lighting, ITS, traffic monitoring, curb/gutter, traffic railings, utility relocation work and other associated work.

Setting panels for Bulkhead Wall Setting coping on Bulkhead Wall Grading new gravel fill berm for sod Reshaping canal to finish grade Installing Drainage Prepping MSE Wall for installation of straps and backfill
  • CLIENT: Turnpike Enterprise
  • PROJECT LIMITS: North of Boynton Beach to North of Lake Worth Road
  • ROLE: CEI Prime Consultant
  • PROJECT LENGTH: 14.Miles
  • ANTICIPATED COMPLETION: Fall 2024
  • ANTICIPATED COST: $169.7 million
  • CONTRACT TYPE: Design Bid Build

Explore More Projects

KINGS HIGHWAY AND INDRIO ROAD INTERSECTION IMPROVEMENT

JTB and San Pablo Road Diverging Diamond Interchange

PGA BOULEVARD RAMP BRIDGE

I-95 Phase 3B2

Experienced and Qualified Engineering Inspection Staff! Meet Our Team

Contact Info

  • Creative Engineering Group Inc
  • 7735 NW 146th St #301 Miami Lakes, Fl 33016
  • 786-362-6626
  • info@cegroupfl.com

Logo Committed to Quality and Dependability.

Our Family

CREATIVE IS HIRING

Creative values energetic, task oriented, forward thinking individuals to fill their TEAM. To join our family, click the link below.

OPEN POSITIONS

EMPLOYEE BENEFITS

EMPLOYEE PORTAL

© 2025 — Creative Engineering Group Inc.

  • Home
  • About
  • Our Team
  • Open Positions