• Home
  • Completed Projects
  • Ongoing Projects
  • News & Insights
  • Meet The Team
  • Careers

Over 15 Years Delivering Quality and Excellence

info@cegroupfl.com
EMPLOYEE PORTAL
Creative Engineering GroupCreative Engineering Group
  • Home
  • Completed Projects
  • Ongoing Projects
  • News & Insights
  • Meet The Team
  • Careers

Linton Blvd. Interchange - Nov2019 Clintmoore Rd. Bridge - Nov2019 Clintmoore Rd. Bridge - Sept2021 SR 15 / US441

SR-15/US 441 Improvements

Repave the existing travel lanes. Add new sidewalk along the west side of the roadway with curb ramps between Shirley Drive and Dr. MLK Jr. Boulevard. Add marked pedestrian crossings at Shirley Drive, Pee Hokey Drive, South of Market Street, Barfield Highway and Dr. MLK Jr. Boulevard. Provide new signing and pavement markings. Add street lighting along the roadway corridor and upgrade lighting at the Bacom Point Road intersection.
  • GROUPING: Western Palmbeach Grouping
  • CLIENT: Palmbeach Operations District 4
  • PROJECT LIMITS: SR-15/US 441 from South Shirley Drive to East Main Street
  • ROLE: CEI Prime Consultant
  • PROJECT LENGTH: 227 days
  • ANTICIPATED COMPLETION: Completed Summer 2023
  • ANTICIPATED COST: $ 4.63 million
  • CONTRACT TYPE: Design Bid Build

Explore More Projects

RAVENSWOOD BRIDGE

Indian Town Rd Improvements

SUNRISE INTERCHANGE

Homestead Extension of Florida’s Turnpike Widening Project

Experienced and Qualified Engineering Inspection Staff! Meet Our Team

Contact Info

  • Creative Engineering Group Inc
  • 7735 NW 146th St #301 Miami Lakes, Fl 33016
  • 786-362-6626
  • info@cegroupfl.com

Logo Committed to Quality and Dependability.

Our Family

CREATIVE IS HIRING

Creative values energetic, task oriented, forward thinking individuals to fill their TEAM. To join our family, click the link below.

OPEN POSITIONS

EMPLOYEE BENEFITS

EMPLOYEE PORTAL

© 2025 — Creative Engineering Group Inc.

  • Home
  • About
  • Our Team
  • Open Positions