Work included adding a new entry ramp to southbound Turnpike from eastbound Sunrise Boulevard; adding a new exit ramp from northbound Turnpike to eastbound Sunrise Boulevard; removing the existing toll plaza at the northbound Turnpike entrance; converting all ramps to All Electronic Tolling; replacing and raising the existing Turnpike bridge over Sunrise Boulevard; widening the travel lanes, bike lanes and enclosed pedestrian walkway; and installing new noise reduction barriers.
SUNRISE INTERCHANGE AT FLORIDA’S TURNPIKE
- CLIENT: Turnpike Enterprise
- PROJECT LIMITS: Sunrise Boulevard between NW 56th Avenue and NW 47th Avenue
- ROLE: CEI Prime Consultant
- PROJECT LENGTH: 0.807 Miles
- COMPLETED: 2019
- COST: $49.5 Million
- CONTRACT TYPE: Design Bid Build